Home Dugout
4-16-08
We are getting closer and closer to
completion of the project. The sod has been laid
and the field has been playable for a week. The new
sound system has been installed around the field as
well as inside the locker room. The final phase for
the field is to have the bullpens installed. All
that will be left is to finish landscaping around
the building, lockers for the locker room, install
steps going up the hill for the fans, install the
backstop pads, install coat hooks in the visitors
dugout, and asphalt. WE ARE CLOSE! We will update
again as progress continues.
4/3/08
We have reached our final steps to
completing the Tom Dedin Field renovations. We
can finally see the light at the end of the tunnel.
As of today, April 3, 2008, sod is being laid and
the irrigation system is being rewired. Plans
to have our 2008 home opener on April 5th is a go!
Once the sod is laid all that will be left is to get
lockers for the locker room, redo the bullpens, asphalt around the building
as well as landscape it, install the sound system and fix up the area beyond the 3rd
base sideline. A new green fence was installed on
both sides of the field. The dugouts are completed
as well. We are also installing 2 new batting cages
down the left field line. The field is looking
beautiful and hopefully will be 100% completed
within 2-3 weeks. We are excited for our parents,
students, alumni, and friends to come out and see
the new facility. We will update the project as we
continue our way to completion.
3/17/08
Mother nature has not been kind
to us so far in regards to completing the
project. We are about 85% complete. The
weather has put us about 4 weeks behind schedule
but our goal is to play our first home game on
March 31. We have postponed our field
dedication day of April 5 to a date to be
determined. The inside of the building is
finished except for a few amenities like
lockers, stools, and office furniture. The
dugouts are also just about finished with only
bat and helmet racks to be installed along with
hooks for jackets, equipment, etc. The new
fencing along the 1st and 3rd base sides is
being completed as we speak with hopes of being
finished by next Monday, March 24. Hopefully we
will also begin rebuilding the bullpens this
week as they are going on the field side of the
fence. The final phases of this project will
also begin this week with drain tile being
installed and the landscaping and warning track
being put in. If all goes well, we may be
playing at home by the end of the month or the
1st week in April. In the mean time, our game
vs. JT on Tuesday, March 18 will be at Joliet
Junior College as well as our game on Wednesday,
March 19. Any questions please contact coach
Smith.
1/22/08
The baseball project continues to
near its conclusion. The insides are close to being
done. Insulation, ceiling grid and tiles, electric
work, and walls were all installed within the past
month. The outside portion is close to being done
as well. Things are moving along great. Our next
step will be to finish the insides of the building
with painting, flooring, media countertop,
stools/chairs, and lockers.